Feasibility studies:



Contract

Year

Client

Study of waste water treatment at concrete plant Dejcici, municipality of Trnovo

2016

Velbos ING d.o.o. Sarajevo

Study of the preliminary water use approval for the project of reconstruction of the intersection M 4.2., street Žrtava domovinskog rata and street November 25, section (002) Skokovi-Srbljani, km 11+230

2015

JP Ceste FBiH

Additional hydraulic study of river Bosna in Doboj

2015

UNDP BiH

Hydraulic studies on micro locations of rivers Bosna, Sava and Drina

2015.

UNDP BiH

Feasibility study for waste water treatment in the municipalities of Travnik, Novi Travnik and Vitez

2015

Municipality of Travnik

Hydraulic analysis for the water flow velocity decrease of river Krivaja on a section in the city with a proposed solution, municipality of Olovo

2015

AVP Sava

Development of the hydrological study for detailed design ”Regulation of river Tinja in Srebrenik”

2015

AVP Sava

Development of the hydrological study of hydropower utilization of the river basin of Gostovic, municipality of Zavidovici

2014

Ministry of Agriculture, Water Management, and Forestry, Canton ZE-DO

Study of the possibility of hydropower utilization of watercourses of category II – river Tribija, municipality of Vares for the potential construction of small hydropower plants up to 5 MW

2014

Ministry of Agriculture, Water Management, and Forestry, Canton ZE-DO

Study of determining water rights, method of establishing water rights

2012

JP Zenica d.o.o.

Study of the use and discharge of waste water, conceptual design, detailed design and as-built drawings for water and sewer systems of petrol station facilities of the customer

2012

Energopetrol d.d.

Study of industrial waste water drainage for the issuance of preliminary water use approval

2012

Ilidža vode d.o.o.

Study of industrial waste water drainage for the issuance of preliminary water use approval

2012

JU Aquaterm Olovo

Study of industrial waste water drainage of the plant for the exploitation of limestone PK Meoršje – Lučenica for the issuance of preliminary water use approval

2012

Miličević d.o.o.

Study of intake and discharge of waste water for the issuance of preliminary water use approval

2012

Al-Dihani d.o.o.

Hydropower utilization of the river Sana – between Zgonsko Polje and the mouth of the river Sana

2009

Opcina Kljuc

Hydropower utilization of the upper course of river Krivaja

2009

Municipalities of Olovo and Zavidovici

Hydropower utiliaztion of the basin of river Fojnica

2009

Municipalities of Olovo and Zavidovici

 


Tel. +387 33 718 286
Fax. +387 33 718 285
GSM: +387 62 994 254
E-mail: higracon@bih.net.ba